← Newsroom
MilestoneNovember 23, 2026
Deep Isolation

Nuclear Waste Innovator Deep Isolation Finalizes Cooperative Agreement with DOE ARPA-E for up to $20 Million in Federal Funding

PLANO, Texas, Nov. 23, 2026 (GLOBE NEWSWIRE) -- Deep Isolation Nuclear, Inc. (OTCQX: DBHL) (“Deep Isolation” or the “Company”), a leading innovator in nuclear waste disposal technology, today announced its’ subsidiary has entered into a cooperative agreement with the U.S. Department of Energy’s Advanced Research Projects Agency-Energy (ARPA-E) under its SCALEUP Ready program providing for up to $20 million in federal funding to advance commercialization of Deep Isolation’s Universal Canister System (UCS) and deep borehole disposal technology over a three-year project. The agreement follows Deep Isolation’s April 2026 announcement that the Company had been selected for ARPA-E SCALEUP funding. The project is designed to advance the UCS from a validated prototype toward commercial deployment through regulatory, engineering and full-scale field activities. The project is expected to include work with Westinghouse to advance the UCS for storage and transportation of spent fuel from its eVinci™ microreactor, including activities supporting a potential Nuclear Regulatory Commission licensing pathway. “This agreement marks an important transition from technology development toward commercial-scale implementation,” said Jesse Sloane, Executive Vice President of Engineering at Deep Isolation and principal investigator for the SCALEUP project. “We are excited to work with ARPA-E and our project collaborators to demonstrate the UCS at full-scale, non-radioactive Commercial Pilot, advance the regulatory pathway and build the technical foundation needed for future commercial deployment.” “ARPA-E backed this technology for its potential to transform the back-end of our nuclear fuel cycle”, said Conner Prochaska, Director of ARPA-E. “This is President Trump’s nuclear renaissance in action – advancing American energy dominance and keeping U.S. nuclear technology at the forefront of global innovation.” The SCALEUP project builds on a series of DOE- and ARPA-E-funded projects that have progressively advanced Deep Isolation’s technology. Earlier projects supported the development, fabrication and physical testing of the UCS, evaluated its performance under conditions representative of a deep borehole environment and demonstrated its potential applicability to spent fuel from advanced reactors and high-level waste from advanced fuel recycling. The project also plans to advance Deep Isolation’s Commercialization Pilot in Cameron, Texas, where the Company and its collaborators are developing a full-scale, at-depth demonstration of deep borehole disposal using nonradioactive materials. The Commercialization Pilot officially launched with a groundbreaking ceremony on January 28, 2026 and is being conducted in collaboration with the Deep Borehole Demonstration Center (“DBDC”), Halliburton (NYSE: HAL), Amentum (NYSE: AMTM), NAC International (TYO: 7004), and Occlusion Nuclear Solutions, to test Deep Isolation’s deep borehole technology for the safe, permanent disposal of nuclear waste. SCALEUP Federal funding is provided on a cost-reimbursement basis and is subject to the agreement’s terms and conditions, including Deep Isolation’s funding of its cost share, satisfaction of technical milestones, environmental and permitting requirements. and ARPA-E’s rights to redirect, reduce, suspend or terminate the project, including at go/no-go decision points. The total approved project cost is approximately $47.5 million, with ARPA-E contributing $20 million and Deep Isolation contributing approximately $27.5 million over the three-year period of performance. Deep Isolation expects to fund its cost share through existing cash on hand and supplemented, if needed, by future financing. Additional information about the agreement, including specific conditions imposed by ARPA-E, is set forth in the Company’s Current Report on Form 8-K filed with the SEC on November 23, 2026.